Past Projects & Performance

Bowie High School

$1,490,722

Fireproofing Replacement, Abatement, Electrical, & More

Demolition and replacement of approximately 330 (2x4) fluorescent light fixtures and associated bulbs. Installed replacement Lo Profile LED fixtures. Removal and replacement of carpet throughout the main office. Painted throughout the school.

Naval Surface Warfare - Carderock

$438,835

Demolition & Asbestos Remediation

SanDow is a General Contractor that self-performs several trades. The scope of work at the Onley Facility included select demo and asbestos abatement which were self-performed by SanDow. SanDow also managed multiple subcontractors (electrical, plumbing and mechanical). 

Department of Labor Child Care Center - United States Government

$389,500

Interior Renovations

200 Constitution Ave, NW, Washington, DC 20210. SanDow provided interior renovations services which included, asbestos abatement, drywall, painting, and flooring, at the DOL Childcare center.

Department of Labor - United States Government

$175,000

Cooling Tower Valve Replacement

SanDow removed insulation and 9 valves from a Department of Labor rooftop cooling tower, we then installed new valves, as well as all required accessories, including electrical, cutting, patching, painting and re-insulation.

Worcester Hall at the University of Maryland

$43,489

Commercial Interior & Exterior Painting

We scraped, repaired, primed, and painted the interior & exterior of the Worcester Hall located at the University of Maryland. The project was completed on top and on budget.

Howard County in Maryland

$100,000

Mercury Vapor Remediation

SanDow’s scope of work included containment of two gyms using engineering controls. SanDow was required to demo the existing wood gym floors to access the rubber membrane beneath. 

Baltimore County & Maryland Police

$ Monthly Contract

Firing Range Cleaning & Lead Abatement

SanDow’s scope of work includes monthly lead abatement of the ranges for the County. SanDow is required to wipe down all surfaces while wearing PPE. The ranges are abated with a lead dissolving solution and all bullet fragments removed and drummed. The filters in the ranges are replaced and area tested.

Inside the firing room.