Patuxent River B6105 TSI Abatement & Re-Insulating
Patuxent River Navy Recreation Center |
Location(s)
|
Project Description
|
SanDow’s Role
GC & Abatement Contractor |
Dollar Value of Contract/Final Construction Cost
$50,169.00 |
Performance Timeliness
September 19, 2022 - September 28, 2022 |
Project Description:
- We provide an experienced crew of asbestos abatement workers.
- We provide the services of an independent industrial hygienist for final visual clearance and working air samples.
- We construct scaffolding to reach the areas to high to access by standing.
- We contain the work area using 6 mil poly sheeting as needed.
- We abate approximately 400 LF of ACM steam pipe lagging.
- We will abate (35) ACM steam pipe fittings.
- Once abatement is complete we will encapsulate the entire area
- We will insulate the piping and fittings once the abatement is complete.
- We will dispose of all waste at an EPA approved landfill.
- We will provide NAS with a waste manifest that documents the legal disposal.
Project Gallery
![1 Installation of fire stopping protection system](https://sandowconstruction.com/wp-content/uploads/2022/10/1.jpeg)
![2 Scissor Lift in a basement](https://sandowconstruction.com/wp-content/uploads/2022/10/2.jpeg)
![3 Basement under construction with scaffolding](https://sandowconstruction.com/wp-content/uploads/2022/10/3.jpeg)
![4 Captured Fireproof basement](https://sandowconstruction.com/wp-content/uploads/2022/10/4.jpeg)
![5 Inspecting Insulation of Existing Crawlspace](https://sandowconstruction.com/wp-content/uploads/2022/10/5.jpeg)
![6 An Employee doing a Home Insulation Service](https://sandowconstruction.com/wp-content/uploads/2022/10/6.jpeg)
![7 Under Construction Basement with Fire Exit](https://sandowconstruction.com/wp-content/uploads/2022/10/7.jpeg)
![8 Clear image of a pipe](https://sandowconstruction.com/wp-content/uploads/2022/10/8.jpeg)
![9 A fire stopping protection system](https://sandowconstruction.com/wp-content/uploads/2022/10/9.jpeg)