Mold Remediation and Cleaning

The Veteran Affairs DC

Location(s)

50 Irving Street NW Washington, DC 20422

Project Description

Mold Remediation and Cleaning at The Veteran Affairs Building in DC

SanDow’s Role

Mold Remediation Specialists

Dollar Value of Contract/Final Construction Cost

$12,527.00

Performance Timeliness

September 1, 2022 - November 22,2022

Phase 1:

  • Using 6-mil poly we will construct a containment with a one stage de-con for ingress and egress.
  • We will install a negative air machine to scrub the air while performing the mold remediation work
  • We will remove approximately 100 SF of water and mold damaged drywall
  • We will clean approximately 100 SF of water and mold damaged drywall
  • We will spray the air with EPA-registered shockwave disinfectant
  • We will scrub and wipe down the area of work with EPA-registered shockwave disinfectant
  • We will tear down and dispose of all containment materials

Phase 2:

  • Using 6-mil poly we will construct a containment with a one stage de-con for ingress and egress
  • We will install a negative air machine to scrub the air while performing the mold remediation work.
  • We will remove approximately 160 SF of water and mold damaged drywall and tile.
  • We will clean approximately 160 SF of water and mold damaged inner drywall.
  • We will spray the air with EPA-registered shockwave disinfectant
  • We will scrub and wipe down the area of work with EPA-registered shockwave disinfectant.
  • We will tear down and dispose of all containment materials.

Project Gallery

Metal frame supported braces
Lead wall protection
Asbestos abatement and other regulated material removal
Broken wall with a Telephone Closet Signage
Installing concealed door straightener