Mold Remediation and Cleaning
The Veteran Affairs DC
Location(s)
50 Irving Street NW Washington, DC 20422
Project Description
Mold Remediation and Cleaning at The Veteran Affairs Building in DC
SanDow’s Role
Mold Remediation Specialists
Dollar Value of Contract/Final Construction Cost
$12,527.00
Performance Timeliness
September 1, 2022 – November 22,2022
Phase 1:
- Using 6-mil poly we will construct a containment with a one stage de-con for ingress and egress.
- We will install a negative air machine to scrub the air while performing the mold remediation work
- We will remove approximately 100 SF of water and mold damaged drywall
- We will clean approximately 100 SF of water and mold damaged drywall
- We will spray the air with EPA-registered shockwave disinfectant
- We will scrub and wipe down the area of work with EPA-registered shockwave disinfectant
- We will tear down and dispose of all containment materials
Phase 2:
- Using 6-mil poly we will construct a containment with a one stage de-con for ingress and egress
- We will install a negative air machine to scrub the air while performing the mold remediation work.
- We will remove approximately 160 SF of water and mold damaged drywall and tile.
- We will clean approximately 160 SF of water and mold damaged inner drywall.
- We will spray the air with EPA-registered shockwave disinfectant
- We will scrub and wipe down the area of work with EPA-registered shockwave disinfectant.
- We will tear down and dispose of all containment materials.
Project Gallery